Module 2 — Influences on Real Vacuum Systems

R1-A Rate of Rise Simulator

Identify gas load patterns from R1-G-CH isolation phase data
R1-A Rig State
VENTED R1-CH chamber R1-G-CH atm FLT-V R1-V-VENT R1-L-VENT R1-V-ISO R1-L-FL R1-P-RP pump FLT-EXH atm R1-L-EXH R1-G-BX ~950 mbar LEAK
R1-G-CH mbar
Facilitator notes
    Rate of Rise — Isolation Phase (R1-V-ISO closed at t = 0)
    0 1 3 5 8 10 time (min) pressure (mbar) Cycle 1 Cycle 2
    R1-G-CH Isolation Phase Log
    Time (min) Pressure (mbar) Rise rate (mbar/min) Note
    The gauge log below was recorded after isolating R1-CH at t = 0. R1-V-ISO closed; R1-P-RP running. Identify the gas load pattern.
    0 1 3 5 8 10 time (min) pressure (mbar) C1 C2
    t (min) P (mbar) Rate (mbar/min)
    Correct: 0 Attempted: 0